Contact
Home / News / Renovation in Flanders 2026: Complete Guide to Subsidy Changes
August 29, 2025

Renovation in Flanders 2026: Complete Guide to Subsidy Changes

Swipe right → more information

Swipe right → more information

Renovation in Flanders 2026: Complete Guide to Subsidy Changes

📅 February 2026
⏱️ 8 min read
🏠 GRAVA Group

⚠️ Critical Deadline Alert

2026 marks a turning point for property owners in Flanders. The Flemish government has approved a comprehensive reform of the Mijn VerbouwPremie subsidy system. These changes will impact thousands of families and investors—for some, doors to subsidies will close, while for others, conditions will actually improve.

Act before February 28, 2026 to secure subsidies under current, more favorable terms.

Key Dates for 2026: The Reform Calendar

To avoid missing out on financial support, remember these two critical dates:

January 1, 2026

Discontinuation of the Demolition and Reconstruction Premium and end of new applications for the Mijn EPC Label Premium.

February 28, 2026

Final deadline to submit applications under current (more favorable) Mijn VerbouwPremie conditions. New, stricter rules take effect March 1, 2026.

Mijn VerbouwPremie: Who Loses and Who Retains Subsidy Rights?

The 2026 reform shifts budget allocation toward the most vulnerable groups, resulting in a dramatic reduction of support for higher incomes and investors.

At-Risk Group: High Incomes (Category 1 & 2) and Investors

This group includes households with middle and high incomes, as well as private investors and landlords (who do not rent through a housing association).

What changes from March 1, 2026?
  • Complete elimination of “building envelope” subsidies: No more subsidies for roof insulation, wall insulation, floor insulation, and replacement of windows and doors (glass and joinery).
  • Reduced heat pump subsidies: Only heat pump and heat pump boiler subsidies remain, but amounts are reduced:
    • Geothermal heat pump: reduced to €4,000
    • Air-to-water heat pump: reduced to €1,500
    • Hybrid heat pump: reduced to €800
    • Air-to-air heat pump: reduced to €300
    • Heat pump boiler: reduced to €450
  • Elimination of bonuses: Increases for replacing electric heating or installation in areas without natural gas networks are eliminated for this group.
💡 Expert Tip: Do you belong to Category 1 or 2? Complete your insulation work and window replacement and submit your application before February 28, 2026. After this date, you will lose thousands of euros in support.

Protected Group: Low Incomes (Category 3 & 4) and Social Landlords

For owner-occupiers with low incomes and landlords who rent through a housing association, conditions will not worsen.

✅ What Remains

Full entitlement to subsidies for all categories (roof, walls, windows, floors, technical systems).

High reimbursement percentages (up to 35% or 50% of invoice) are maintained.

Non-Residential Buildings

Investors in commercial real estate (offices, shops, warehouses) will be hit hardest. From March 1, 2026, they completely lose the right to Mijn VerbouwPremie.

Discontinuation of Demolition and Reconstruction Premium

The Flemish premium of €10,000 for demolishing an old building and reconstructing a new residence is being abolished.

  • The rule: The premium will no longer be granted if the environmental permit for the project is approved from January 1, 2026.
  • Transition period: If your permit was approved before January 1, 2026, you must apply for the premium within 3 months of approval, but no later than March 31, 2026.

End of the EPC Label Premium

The premium for improving a home’s energy label (EPC Label Premium) also stops in 2026.

  • Condition: Your starting EPC (from before the work) must be dated before January 1, 2026.
  • From January 1, 2026: New trajectories can no longer be started. If you have already activated the process (starting EPC before 2026), you retain 5 years to complete the work and apply for the premium.

Borrowing: Changes to Mijn VerbouwLening

The advantageous renovation loan (Mijn VerbouwLening) also changes from early 2026.

✅ Good News for Low Incomes

Additional interest rate reduction (1% for Cat. 3 and 2% for Cat. 4). This could mean interest rates drop to 0% for the most vulnerable families.

📊 For Other Categories

Interest rate adjusted to legal market rate (in 2025 this was 1.5%).

⚠️ Restriction

From 2026, owners who have a second home in full ownership no longer qualify for this loan.

Summary: What Should You Do?

Your Situation Status in 2026 Advice
High/Middle Income (Cat. 1, 2) ❌ No subsidies for insulation/windows

🔽 Reduced heat pump subsidies
Urgent: Complete work and apply before 02/28/2026
Low Income (Cat. 3, 4) ✅ All subsidies maintained

✅ Loan possible at 0%
You can plan as usual; conditions improve
Investor (non-residential) ❌ Complete loss of subsidy rights Submit application before 02/28/2026
Demolition & Reconstruction ❌ €10,000 premium stops Ensure approved permit before 01/01/2026
📋 Don’t forget the documents! For every application, you need final invoices (max. 2 years old) and mandatory Contractor Certificates.

📺 Watch Our Complete Guide

Watch our comprehensive video guide to understand all the changes and how they affect you

🚀 Ready to Start Your Renovation Project?

GRAVA Group is your trusted partner for all renovation work eligible for subsidies. Don’t wait—2025 is your last chance to benefit from current generous support measures.

Our Renovation Services

GRAVA Group offers comprehensive renovation solutions to help you maximize your subsidies before the deadline:

🏠 Roofworks

Complete roof renovation, insulation, and repair services

Learn More →

🧱 Facade Works

Professional facade renovation and restoration

Learn More →

🪟 Windows & Doors

High-performance window and door replacement

Learn More →

🏔️ Pitched Roofs

Expert pitched roof installation and renovation

Learn More →

📐 Flat Roofs

Modern flat roof solutions and waterproofing

Learn More →

🔥 Roof Insulation

Energy-efficient insulation for maximum savings

Learn More →

Specialized Facade Solutions

🌲 Wood Facade

Beautiful and sustainable wooden cladding

Explore Options →

🍃 Spray Cork Facade

Eco-friendly spray cork insulation and finishing

Discover Benefits →

🧱 Stone Strips Facade

Elegant stone strip facade installation

View Gallery →

🏗️ Rockpanel / Trespa

Durable composite panel facade systems

See Applications →

⛰️ Natural Slate

Premium natural slate roofing and cladding

Learn More →

✨ Roof & Facade Cleaning

Professional cleaning and maintenance services

Request Service →

📋 Need Help with EPC Label Certification?

We provide complete EPC label attestation services to help you qualify for maximum subsidies.

⏰ Time is Running Out

Planning a renovation? Don’t wait too long. 2025 is the last opportunity to take advantage of the current broad support measures. Contact GRAVA Group today for a free consultation and discover how we can help you maximize your subsidies before the February 28, 2026 deadline.

Latest news

  • August 29, 2025

    Renovation in Flanders 2026: Complete Guide to Subsidy Changes

    Renovation in Flanders 2026: Complete Guide to Subsidy Changes
    Reed More
  • August 29, 2025

    Roof Cleaning

    The company is proud to announce the completion of construction of a new residential complex in the heart of the city
    Reed More
  • August 16, 2025

    Facade Crepie renovatie

    Reed More
  • August 29, 2025

    Complex renovation

    The company is proud to announce the completion of construction of a new residential complex in the heart of the city
    Reed More
  • February 16, 2026

    Roof renovation

    Grava Group is proud to present another renovated home: Andenne Roof Renovation – 230 m² Natural Slate with 12 cm PIR Insulation and VELUX Replacement in Just 2 Weeks
    Reed More
  • August 29, 2025

    New roof – 20 houses

    The company is proud to announce the completion of construction of a new residential complex
    Reed More
  • August 29, 2025

    Facade isolation Lier

    The company is proud to announce the completion of isolation 1300 m2 in Lier
    Reed More
  • August 29, 2025

    Window installation

    The company is proud to announce the completion of window installation for the nice house
    Reed More