Water and drainage
Replacing old pipes during the renovation means new floors and walls won't have to be opened up again later.

Full renovation / Building services & finishing
The work that makes a home truly durable. Less visible, but a full renovation is the moment to do it properly — before the new floors and walls go in.

Replacing old pipes during the renovation means new floors and walls won't have to be opened up again later.
First tackle the cause of damp, then the building services, and only then the finishing — we plan everything in the right order.

Less visible, but a full renovation is the moment to do them properly — before the new floors and walls go in.
Replacing old pipes during the renovation means new floors and walls won't have to be opened up again later.
Wiring, earthing, consumer unit, RCDs and circuits to current requirements — and inspected.
Tackle the cause first — a leak, rising damp, a thermal bridge or too little ventilation — and only then finish.
Controlling water around the home protects the foundations, the basement and the new interior finish.
Tiles, parquet, laminate, poured floor or wood: chosen once the substrate and building services are ready.
Paint, plaster, plasterboard or decorative panels — depending on flatness, acoustics and use.
Tackle damp, foundations, basement and drainage
Renew water, drainage and electricity
Prepare plastering and level floors
Floors, walls and ceilings
The cause of damp: a leak, rising damp, a thermal bridge or too little ventilation.
Water and drainage pipes: age and condition.
Electricity: wiring, earthing, consumer unit, RCDs and circuits.
Substrate and flatness before the new floors and walls.
Roof, façade and joinery in one schedule, with one point of contact.
26cities in 6 provinces
from Bruges to Namur
What's behind the wall determines how long the finish in front of it stays good.



Which grants are available for your renovation depends on the work and your situation. Our adviser finds out what you're entitled to, submits the applications with you and, if you wish, arranges a renovation loan through KBC.
Replacing old pipes during the renovation means new floors and walls won't have to be opened up again later.
Wiring, earthing, consumer unit, RCDs and circuits must meet current requirements and be inspected.
Cause first — a leak, rising damp, a thermal bridge or too little ventilation — and only then the finishing.
Once the substrate and building services are ready: tiles, parquet, laminate, poured floor or wood.
Our specialist inspects your home and sends you a tailored, no-obligation quote within 48 hours.
Free 3D visualisation with your quote